Photos from week 30 - 10/25/09
This weekend was a flooring weekend. (plus some non-house stuff like working at the boat club and winterizing the boat.
This the guest bedroom. It's done cept for the trim around the windows. This was actually Week 26 work.
The funky lamp/ (wall color washed out in the flash)
Looking back toward the door and closet.
Now on to week 30. Friday morning started by moving the flooring out of the master bedroom into the hall. Each one is ~60 pounds. Oy my back.
Master bedroom floor finished as of 8:00 Sunday night
Looking the other way.
One more view
Here's the new master bath shower. I gave in and had it done by a pro. I have enough to do with stuff I kinda know how to do let alone tile. (the little pattern area is a shampoo area)
The floor and seat. We still have to get a class door made. The tile guys finished up just before we left for vacation Oct 2.
The toilet and eventual shelving area.
Another view.